SimEng
Reliability, Availability and Maintainability (RAM) Tools
 
     
     
 

Home

Products Consulting Demo Case Studies RAM Calculator Download Partners
 
 
PLASMA (Oil and Gas Industry)
 

General:-

  • Powerful visual interface with simple drag and drop techniques;

  • Deterministic and stochastic techniques;

  • Series, Active Redundancy (Full, Partial or Conditional) and Standby Redundancy (Identical units or Different units);

  • Control of the sizing of parallel units as a function of time (i.e. varying levels of effective redundancy);

  • Load Sharing;

  • Production Availability i.e. throughput estimation;

  • System or component importance ranking; It enables the user to identify the systems or components that are the main contributors to Production Unavailability, Total Down Time, Cost, Safety Criticality, Asset Criticality and Environmental Criticality;

  • Modelling complex systems using multiple layers of RBDs and PFDs.

 

Click to enlarge

 

Click to enlarge

Click to enlarge

Maintenance modelling:-

  • Unscheduled, Delayed (e.g. seasonal);

  • Maintenance duration and restoration factors;

  • Maintenance policies;

  • Planned;

  • Condition monitoring;

  • Opportunity maintenance;

  • Services and utilities;

  • Job priority;

  • Spare parts pools.

 

Click to enlarge

Click to enlarge

Operating Policies

  • Makeup (by boosting);

  • prioritised (of product exporting);

  • monitoring (of production movements);

  • Deferred Production;

  • Flaring Operations;

  • Load Shedding;

  • Line packing and

 

Production Phasing and Transient Data:-

  • Control of phasing-in and phasing-out of any part of the logic network;

  • Control of the production capacity within any part of the network;

  • Control of contract return period (for sales quota make-up) as a function of time;

  • Control of branch boost factors as a function of time;

  • Control of buffer storage volumes as a function of time;

  • Control of export scheduling criteria as a function of time;

  • Control of maximum flow in a branch as a function of time;

Click to enlarge

Life Cycle Scenarios

  • Economic Modelling aspects:- CAPEX, OPEX, NPV etc.;

  • Performance and asset optimisation.

 

Logistics

  • FPSO and Subsea;

  • Tanker Export Modelling:- Transport mode (sea, road or rail), Operations Mode (define whether dealing with export or import), Berth data (dual tanker loading operations);

  • Number of shuttle tankers in the fleet, Carrying capacity, Range, Early and Late arrivals etc.;

  • Iconic animation (moving ships, etc.);

  • Operations details of shuttles;

  • Maintenance Vessel;

  • Weather Module:- Location (reference to geographical location of shuttle loading facility)

  • Seasons (default given for Northern Hemisphere)

  • Weather Data Matrix (comprising cumulative probability of nominated wave heights per season and the associated average of occurrence of this range)

 

 

 

Click to enlarge

Other modelling details

  • Interactive construction of Network, Fault Tree or Event Tree diagrams;

  • Multiple sources and production profiles;

  • Sub-system or pagination facilities for large Network, Fault Tree and Event Tree diagrams;

  • Import and export facilities;

  • Interface with Excel spreadsheets. Effectively allowing the user to export and import data to and from other spreadsheets;

  • Multiple Sales Quotas;

  • General failure behaviour of an equipment i.e. bathtub curve.

Click to enlarge


Copyright - All rights reserved  - SimEng 2007